05921 250043 principalzrtich@gmail.com

Result(Special)

In case of any discrepancy, Result available at ZRTI office shall be considered final.

 
Course Category Duration Date  
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 06.1.16 to 23.01.16 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 16.02.16 to 04.03.16 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 03.05.16 to 20.05.16 View/Download
JE SEC ENGG. MRT-11 18 30.05.16 to 18.06.16 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 13.07.16 to 30.07.16 View/Download
S-5 TMO/TWgn. Dr / RRV Dr.(In.) 16 03.10.16 to 22.10.16 View/Download
JE SEC ENGG. MRT-11 21 20.12.16 to 09.01.17 View/Download
JE SEC ENGG. MRT-11 21 15.03.17 to 05.04.17 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 17.05.17 to 30.05.17 View/Download
JE SEC ENGG. MRT-11 18 29.05.17 to 17.06.17 View/Download
JE SEC ENGG. MRT-11 18 05.07.17 to 25.07.17 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 12.07.17 to 25.07.17 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 04.10.17 to 17.10.17 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 06.12.17 to 19.12.17 View/Download
JE & SSE MRT-11 18 01.01.18 to 20.01.18 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 14.02.18 to 28.02.18 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 07.05.18 to 19.05.18 View/Download
JE SEC ENGG. MRT-11 21 21.05.18 to 09.06.18 View/Download
JE SEC ENGG. MRT-11 18 09.07.18 to 28.07.18 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 02.07.18 to 14.07.18 View/Download
JE SEC ENGG. MRT-11 18 27.08.18 to 17.09.18 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 16 15.10.18 to 29.10.18 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 10.12.18 to 22.12.18 View/Download
MRT-11 Train Operating with Signalling 21 28.01.19 to 16.02.19 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 08.7.19 to 20.7.19 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 15 30.09.19 to 15.10.19 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 03.02.20 to 15.02.20 View/Download
Train Operating with Signalling MRT-11 12 16/10/20 to 29/10/20 View/Download
Train Operating with Signalling MRT-11 12 02.11.20 to 16.11.20 View/Download
Train Operating with Signalling MRT-11 12 04.01.21 to 16.01.21 View/Download
Train Operating with Signalling MRT-11 16 03.02.21 to 16.02.21 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 08.02.21 to 20.02.21 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 12.03.21 to 25.03.21 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) S-5 12 31/08/21 to 20/09/21 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) SI/SP-1(S-5) 18 29.09.21 to 22.10.21 View/Download
Train Operating with Signalling MRT-11 16 04.10.21 to 18.10.21 View/Download
Train Operating with Signalling MRT-11 12 20.10.21 to 02.11.21 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) SI/SP-1 18 06.12.21 to 27.12.22 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) SI/SP-1 18 14.01.22 to 19.02.22 View/Download
Train Operating with Signalling MRT-11 12 14.02.22 to 26.02.22 View/Download
Train Operating with Signalling MRT-11 12 26.03.22 to 08.04.22 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) SI/SP-1 18 19.04.22 to 10.05.22 View/Download
TMO/TWgn. Dr / RRV Dr.(In.) SI-1 18 21.03.2022 to 09.04.2022 View/Download